We find, vet, and negotiate colocation for GPU deployments, from a single rack to multi-megawatt, liquid-cooled builds across the US.
1.4%
Vacancy across North America's primary data center markets, a record low (CBRE, H1 2026)
80%+
Of capacity under construction is already preleased before it's built (CBRE, H1 2026)
4 years
Average wait for a new US grid connection (JLL)
132 kW
Per GB300 NVL72 rack (HPE), vs. a 7.8 kW industry average (Uptime Institute, 2026)
Sources: CBRE North America Data Center Trends H1 2026; JLL North America Data Center Report; HPE GB300 NVL72 QuickSpecs; Uptime Institute Global Data Center Survey 2026.
US data center vacancy hit a record low of 1.4% in H1 2026, and most new capacity is spoken for before it's energized (CBRE). Finding power is now the hard part of deploying GPUs.
Capacity with real energization dates is rare and moves fast.
100+ kW liquid-cooled racks rule out most existing halls.
Deposits, power pass-through, and 3–5 year minimums need negotiating.
Send one requirement. We take it to the operators who can actually deliver and come back with vetted options, power dates and terms.
Request capacityWe bring AI tenants who are scoped and ready to sign: MW, rack density, cooling, timing and term defined up front.
List your capacityWe build a full spec with you: power, density, cooling, location, timing, term, tier, network.
We take it to operators with capacity that fits, anonymously if you prefer.
We confirm power dates, cooling, and site ownership before any introduction.
We help negotiate terms and stay involved through move-in.
Tiers follow CBRE, JLL and Cushman & Wakefield 2026 reporting. Emerging markets are ranked by signed AI tenants and running capacity.
Send what you have. If some of it isn't settled yet, we'll work it out with you on the first call.
Request capacityA colocation advisor finds and negotiates data center space and power for a tenant. LD Advisors scopes your GPU deployment, takes it to operators with matching capacity, confirms power dates and cooling, and helps negotiate terms through move-in.
Send your IT load (MW or rack count), kW per rack, cooling type, preferred markets, target date and term. If you don't know some of it yet, we'll help you work it out on the first call.
Yes, that's our focus. GB300 NVL72-class racks need direct-to-chip liquid cooling and over 100 kW per rack. We only bring back sites that can support that density, with a confirmed energization date.
We work on requirements from a single rack to multi-megawatt builds, for neoclouds, AI labs, and physical AI companies.
We source capacity nationwide. Tell us your latency, power, and budget constraints, and we'll suggest markets that fit.
Not without your permission. We can take your requirements to operators anonymously and share details only under NDA.
Colocation rents you racks, power, and cooling for hardware you own. Powered shell is an energized building you fit out yourself. GPU-as-a-service rents you the GPUs too. We focus on colocation and powered shell for teams that own their hardware.
We'll come back the same business day. Details stay under NDA, and we can take your requirement to operators anonymously.
Have capacity to fill? List your capacity